Jasmine

9 Twenty Fourth Avenue, Palm Beach QLD 4221

Pre-construction
  • Low-Rise
  • 7 residences
  • 16 car spaces
Progress verified
Estimated completion 2026
  1. Plans approved
  2. Pre-construction
  3. Under construction
  4. Complete

Approved and getting underway in Palm Beach

This development isn’t being actively monitored by the developer
If this is your development, claim your listing

Development information for Jasmine

Local Government Area:
City of Gold Coast
Project Status:
Pre-construction
Estimated Completion Date:
2026
Residences:
7
Car Spaces:
16
Buildings:
1
Building Type:
Low-Rise
Floors:
4

Meet the team behind Jasmine - 9 Twenty Fourth Avenue, Palm Beach

Landmark intelligence by

Beachside positioning situated 120 metres from Gold Coast Highway express bus routes.

What's near Jasmine

  1. Under 500m
    Transport

    Gold Coast Highway at Twenty Fifth Avenue Bus Stop

    Operates high-frequency services across routes 700 and 777 connecting directly to Broadbeach and Gold Coast Airport.

    Gardens

    Tallebudgera Creek Parklands

    Provides open green space, sheltered picnic facilities, walking paths, and calm-water recreational access.

  2. Under 1km
    Education

    Palm Beach State School

    Provides public primary education for Prep through Year 6 students within the local catchment.

  3. Under 1.5km
    Groceries

    Nineteenth Avenue Shopping Centre

    Anchored by a full-line Woolworths supermarket alongside everyday essential services and specialty retail.

    GP / Medical

    19th Avenue Family Practice

    Delivers general practitioner services, chronic condition management, and on-site health checks.

Palm Beach, QLD 4221

Palm Beach demonstrates consistent capital growth driven by high-income owner-occupier demand and limited land supply along the southern coastline. Regional accessibility is supported by north-south arterial transit on the Gold Coast Highway and direct connections to the Pacific Motorway.


Infrastructure updates

Planning under the Gold Coast City Plan aligns with state transport corridor enhancements following the $1.2 billion Gold Coast Light Rail Stage 3 project and subsequent southern Gold Coast rapid transit connections.

Amenities near Jasmine