Eyre Road, North Boambee Valley

Eyre Road, North Boambee Valley NSW 2450

Pre-construction
  • 15 residences
  • 25 car spaces
Progress verified
Estimated completion late 2027
  1. Plans approved
  2. Pre-construction
  3. Under construction
  4. Complete

Approved and getting underway in North Boambee Valley

This development isn’t being actively monitored by the developer
If this is your development, claim your listing

Development information for Eyre Road, North Boambee Valley

Local Government Area:
Coffs Harbour City Council
Project Status:
Pre-construction
Estimated Completion Date:
Late 2027
Residences:
15
Car Spaces:
25
Landmark intelligence by

Tranquil master-planned enclave situated less than one kilometre from Bishop Druitt College.

What's near Eyre Road, North Boambee Valley

  1. Under 500m
    Gardens

    Lakes Playground

    Features children's play equipment, sheltered picnic areas, and paved walking and cycling paths around estate waterways.

    Transport

    Lakes Drive Bus Stop

    Servicing bus routes 367 and 390 with direct connections to Coffs Harbour CBD and Park Beach Plaza.

  2. Under 1km
    Education

    Bishop Druitt College

    Provides independent co-educational schooling from Kindergarten through to Year 12 across a 15-hectare campus.

  3. Under 2.5km
    GP / Medical

    Specialist Medical Centre

    Accommodates general practice suites, urgent medical care, imaging clinics, and diagnostic pathology facilities.

  4. Under 3.5km
    Groceries

    Woolworths Coffs Central

    Supplies a full-line supermarket layout alongside fresh produce departments and direct-to-boot grocery collection.

North Boambee Valley, NSW 2450

North Boambee Valley represents a high-growth residential corridor popular with family demographics seeking proximity to regional education and the Coffs Harbour Health Campus. The locality benefits from steady capital appreciation driven by low-density master-planned subdivisions and continuous civic infrastructure upgrades.


Infrastructure updates

The $10.5m North Boambee Road upgrade and bridge project, supported by $5.85m from the NSW Government Accelerated Infrastructure Fund and $4.65m from City of Coffs Harbour, delivers raised flood-resilient access unlocking future residential stages under the Coffs Harbour LEP 2013.

Amenities near Eyre Road, North Boambee Valley