1/1
Callista Palm Beach

Callista Palm Beach

192 Cypress Terrace, Palm Beach QLD 4221

Construction completeSold out
  • 4 residences
  • Townhouses
Progress verified
Year completed 2023
  1. Plans approved
  2. Construction started
  3. Construction complete
  4. Completed 2023

Construction is complete and ready to move in

Our take by

Apartments loves Callista Palm Beach because…

Callista reinterprets the modern coastal home through an exclusive enclave of tri-level residences conceived by Chapter Two and sculpted by C2 Architecture. Inside, Louise Walsh Interior Design introduces refined, house-scale volumes defined by sweeping curved stone island benches, bespoke artisan joinery, and integrated Miele appointments. Expansive open-plan living zones dissolve effortlessly into private landscaped terraces, balancing generous vertical layouts with intuitive natural cross-ventilation and exceptional craftsmanship.

Development information for Callista Palm Beach

Local Government Area:
City of Gold Coast
Project Status:
Construction complete
Year Completed:
2023
Residences:
4
Building Type:
Townhouses

Meet the team behind Callista Palm Beach - 192 Cypress Terrace, Palm Beach

Amenities near Callista Palm Beach

Built-in buyer protection

State-backed peace of mind for your new home.

6.5-year structural protection

Covered for up to 6 years and 6 months post-completion.

1-year builder care period

Maintenance and aftercare coverage for up to 1 year post-completion.

Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.

News about Callista Palm Beach - 192 Cypress Terrace, Palm Beach