Mona

285 Pro Hart Avenue, Strathnairn ACT 2615

Under constructionSelling now
  • 23 residences
  • Townhouses
Progress verified
Estimated completion late 2026
  1. Plans approved
  2. Construction started
  3. Under construction
  4. Complete

Under construction by Meriton, on track for late 2026

This development isn’t being actively monitored by the developer
If this is your development, claim your listing

MONA, Strathnairn: inspired living, in every detail.

23 townhomes, six floorplans to choose

MONA is a boutique collection of 23 architecturally designed townhomes at 285 Pro Hart Avenue, Strathnairn, offered across six floorplans and two colour schemes.

20mm stone benchtops, induction cooking

Kitchens feature 20mm stone benchtops, soft-close joinery, induction cooking and quality appliances, while bathrooms offer floor-to-ceiling tiling, stone-topped vanities and frameless shower screens.

Solar power and EV charging ready

Each home includes solar power, EV charging provision, a 7-star energy rating, video intercom entry and secure garaging or allocated parking.

Parklands and walking trails at your door

MONA sits within the Ginninderry precinct in Strathnairn, surrounded by parklands and walking trails, close to Kippax Fair and Belconnen's growing amenities.

Sold through Carter and Co Agents

MONA is brought to market by Tom Coates and James Carter of Carter and Co Agents.

Book a private appointment with the sales team

Contact the MONA sales team to arrange a private appointment.

Our take by

Apartments loves Mona because…

Mona introduces a boutique enclave of architecturally crafted townhomes that balance robust sustainability with refined modern design. Each dual-level residence is engineered for superior thermal efficiency, featuring an impressive 7-star energy rating, integrated solar arrays, and high-performance double glazing. Open-plan interiors flow effortlessly into private landscaped courtyards, enriched by natural timber flooring, stone benchtops, and tailored joinery across two curated colour schemes.

Development information for Mona

Project Status:
Under construction
Estimated Completion Date:
Late 2026
Residences:
23

Meet the team behind Mona - 285 Pro Hart Avenue, Strathnairn

Landmark intelligence by

Contemporary master-planned living footsteps from local bus transit and Strathnairn School.

What's near Mona

  1. Under 500m
    Transport

    Pro Hart Avenue Bus Stop

    Serviced by Transport Canberra Route 903 offering regular connections to Kippax Interchange and Belconnen.

    Gardens

    Paddys Park

    Spans 2.7 hectares and features a multi-use sports court, enclosed cricket practice nets, play areas, and barbecue facilities.

  2. Under 1km
    Education

    Strathnairn School

    Provides zero-emissions public education infrastructure accommodating early learning through to Year 6 primary students.

  3. Under 3km
    Groceries

    Kippax Fair Shopping Centre

    Anchored by Woolworths and ALDI supermarkets alongside bakeries, pharmacies, and specialty retail stores.

    GP / Medical

    Kippax Medical Centre

    Delivers comprehensive primary care services including general practitioner appointments, immunisations, and allied health care.

Strathnairn, ACT 2615

Strathnairn serves as the inaugural suburb of the 6-Star Green Star Ginninderry master plan, attracting young families and professionals with newly developed, energy-efficient housing stock. The area delivers direct arterial road connectivity to the Belconnen Town Centre and Canberra CBD via Drake-Brockman Drive and William Hovell Drive.


Infrastructure updates

The ACT Government and Suburban Land Agency are advancing the Ginninderry Master Plan under ACT Territory Plan Variation DV351, supported by the $127.1 million Strathnairn School project and scheduled construction of the Strathnairn Village retail centre on Pro Hart Avenue.

Amenities near Mona

News about Mona - 285 Pro Hart Avenue, Strathnairn

Built-in buyer protection

State-backed peace of mind for your new home.

6-year structural protection

Covered for 6 years post-completion.

2-year builder care period

Maintenance coverage for 2 years post-completion.

Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.