143-146 Esplanade, Aldinga Beach
143-146 Esplanade, Aldinga Beach SA 5173
- 16 residences
- 2 floors
- Townhouses
- Plans approved
- Pre-construction
- Under construction
- Complete
Approved and getting underway in Aldinga Beach
If this is your development, claim your listing
Apartments loves 143-146 Esplanade, Aldinga Beach because…
Ostro captures the sculptural drama of the Fleurieu coastline through an architectural vision conceived by Studio Nine Architects and executed by Bettio Constructions. Gentle facade curvatures echo undulating ocean swells, wrapping two-level layouts that feature private internal courtyards, expansive sea-facing balconies, and tactile palettes of natural stone and warm timber. Thoughtfully oriented to maximise coastal cross-ventilation and natural daylight, each residence is seamlessly integrated into endemic coastal gardens curated by ASPECT Studios.
Development information for 143-146 Esplanade, Aldinga Beach
Meet the team behind 143-146 Esplanade, Aldinga Beach
“Absolute beachfront position along the Esplanade with immediate access to Adelaide Metro bus routes.”
What's near 143-146 Esplanade, Aldinga Beach
- Under 500mTransport
Stop 126 The Esplanade Bus Stop
Services Adelaide Metro bus route 750 providing direct transit connections to the Seaford railway interchange.
- Under 1kmGardens
John Nicholl Reserve
Features open green space, shaded picnic seating, a children playground, and a community BMX pump track.
- Under 1.5kmGP / Medical
Pro Health Care Aldinga Medical Centre
Provides general practice consultations, pathology collection, allied health services, and an adjoining pharmacy.
- Under 2kmGroceries
Aldinga Central Shopping Centre
Anchored by Coles and Drakes supermarkets alongside essential retail, banking facilities, and daily amenities.
EducationAldinga Beach Primary School
Delivers government primary schooling from preschool through Year 6 with dedicated student support facilities.
Aldinga Beach, SA 5173
Aldinga Beach has recorded sustained property value growth driven by demand from families and sea-change owner-occupiers. The precinct is supported by regional road upgrades along Main South Road and connecting bus links to the Seaford rail interchange.
Infrastructure updates
The City of Onkaparinga and Renewal SA are executing the Aldinga Structure Plan to deliver master-planned residential supply, supported by federal funding under the Safer Local Roads and Infrastructure Program for the Norman Road corridor reconstruction.
Amenities near 143-146 Esplanade, Aldinga Beach
Built-in buyer protection
State-backed peace of mind for your new home.
6-year structural protection
Covered for 6 years post-completion.
2-year builder care period
Maintenance coverage for 2 years post-completion.
Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.
Priority access to new developments near Aldinga Beach
By continuing you agree to updates and to our Terms & Privacy Policy


