77 Sutton Street, Redcliffe

77 Sutton Street, Redcliffe QLD 4020

Pre-construction
  • 67 residences
  • Apartments
  • 153 car spaces
Progress verified
Estimated completion late 2030
  1. Plans approved
  2. Pre-construction
  3. Under construction
  4. Complete

Approved and getting underway in Redcliffe

This development isn’t being actively monitored by the developer
If this is your development, claim your listing
Our take by

Apartments loves 77 Sutton Street, Redcliffe because…

77 Sutton Street brings a contemporary midrise presence to the Redcliffe peninsula, drawing architectural inspiration from the coastal setting's geological and natural textures. Spearheaded by Sam Hanna & Co, the building is composed of generous open-plan layouts that prioritise passive cooling, acoustic privacy, and abundant daylight via expansive outdoor living domains. Refined internal appointments and tactile finishes seamlessly extend entertaining spaces outward, cultivating an enduring sense of craftsmanship and coastal composure.

Development information for 77 Sutton Street, Redcliffe

Local Government Area:
City of Moreton Bay
Project Status:
Pre-construction
Estimated Completion Date:
Late 2030
Residences:
67
Car Spaces:
153
Landmark intelligence by

“A coastal Redcliffe address 100 metres from frequent transit and central retail conveniences.”

What's near 77 Sutton Street, Redcliffe

  1. Under 500m
    Transport

    Anzac Avenue at Sutton Street Bus Stop

    Provides Translink bus routes 660, 680, and 690 connecting across the peninsula and to Kippa-Ring Station.

    Groceries

    Bluewater Square

    Anchored by a Woolworths supermarket alongside specialty shops, fresh food retailers, and essential services.

    GP / Medical

    Sutton Street Medical

    Operates as an accredited general practice clinic offering routine family medicine and preventative care.

    Gardens

    Settlement Cove Lagoon

    Features a large public swimming lagoon, picnic shelters, and connected seaside walking paths.

  2. Under 1km
    Education

    Humpybong State School

    Delivers co-educational primary education from prep through year 6 within the local catchment area.

Redcliffe, QLD 4020

Redcliffe demonstrates sustained property demand underpinned by downsizers and families seeking established bayside amenity. Transport connectivity is anchored by bus networks linking directly to the Kippa-Ring railway station and arterial links across the Moreton Bay region.


Infrastructure updates

Governed by the Moreton Bay Regional Council Planning Scheme under the Redcliffe Kippa-Ring Local Plan, the precinct supports mixed-use centre development while benefiting from the nearby $1.1 billion Redcliffe Hospital expansion project.

Amenities near 77 Sutton Street, Redcliffe

Built-in buyer protection

State-backed peace of mind for your new home.

6.5-year structural protection

Covered for up to 6 years and 6 months post-completion.

1-year builder care period

Maintenance and aftercare coverage for up to 1 year post-completion.

Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.