6-8 Manton Street, Darwin

6-8 Manton Street, Darwin City NT 0800

Pre-construction
  • 48 residences
  • 15 floors
  • Apartments
Progress verified
  1. Plans approved
  2. Pre-construction
  3. Under construction
  4. Complete

Approved and getting underway in Darwin City

This development isn’t being actively monitored by the developer
If this is your development, claim your listing

Development information for 6-8 Manton Street, Darwin

Local Government Area:
Darwin Municipality
Project Status:
Pre-construction
Residences:
48
Car Spaces:
102
Buildings:
1
Building Type:
High-Rise
Floors:
15
Landmark intelligence by

A central Darwin address footsteps from Cavenagh Street retail, university campuses, and harbour parklands.

What's near 6-8 Manton Street, Darwin

  1. Under 500m
    Transport

    Darwin City Bus Stops (Cavenagh Street)

    High-frequency bus stops servicing key express routes across Greater Darwin, Casuarina, and Palmerston.

    Education

    Charles Darwin University Danala Precinct

    Modern multi-storey education campus housing university lecture theatres, tertiary teaching facilities, and the Darwin CBD library.

    GP / Medical

    Cavenagh Medical Centre

    General medical practice providing health assessments, pathology referrals, immunisations, and chronic disease management.

    Groceries

    Woolworths Darwin

    Full-line supermarket offering fresh produce, groceries, and an attached BWS liquor outlet.

  2. Under 1km
    Gardens

    Bicentennial Park

    Harbourfront public park offering walking trails, shaded picnic areas, exercise stations, and coastal lookout points.

Darwin City, NT 0800

Darwin City maintains steady rental demand driven by defence personnel, public sector professionals, and tertiary students attending the central university precinct. Transport connectivity is anchored by key arterial corridors and an extensive regional bus network linking directly to Casuarina and Palmerston.


Infrastructure updates

The $250 million Darwin City Deal continues to deliver civic revitalisation through the completion of the CDU Danala Education and Community Precinct and ongoing urban heat mitigation works under the Darwin CBD Master Plan.

Amenities near 6-8 Manton Street, Darwin

Built-in buyer protection

State-backed peace of mind for your new home.

6.25-year structural protection

Covered for up to 6 years and 3 months post-completion.

1-year builder care period

Maintenance and aftercare coverage for up to 1 year post-completion.

Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.