32-34 Lower Clifton Terrace, Red Hill
32-34 Lower Clifton Terrace, Red Hill QLD 4059
- 38 residences
- Apartments
- 21 car spaces
- Plans approved
- Pre-construction
- Under construction
- Complete
Approved and getting underway in Red Hill
If this is your development, claim your listing
Development information for 32-34 Lower Clifton Terrace, Red Hill
“Prime inner-city position 450 metres from Normanby Busway Station and Kelvin Grove Village.”
What's near 32-34 Lower Clifton Terrace, Red Hill
- Under 500mGP / Medical
Red Hill Doctors Surgery
Provides general medical consultations, preventive healthcare, and pathology services.
TransportNormanby Busway Station
Major Northern Busway station offering rapid, high-frequency transit routes directly into the Brisbane CBD.
EducationPetrie Terrace State School
Established government primary school catering to students from Prep through to Year 6.
- Under 1kmGardens
Victoria Park / Barrambin
Features 64 hectares of open parkland, walking trails, sports fields, and cycleway connections.
GroceriesWoolworths Kelvin Grove
Full-line supermarket situated within Kelvin Grove Urban Village offering fresh produce, groceries, and pharmacy retail.
Red Hill, QLD 4059
Red Hill is an affluent inner-north Brisbane suburb experiencing strong capital growth driven by high-income professionals seeking proximity to the CBD. The precinct benefits from direct arterial connectivity along Musgrave Road, high-frequency busway access, and immediate adjacency to major educational institutions.
Infrastructure updates
Under the Brisbane City Plan 2014 and the Ithaca District Neighbourhood Plan, the precinct is integrated with major trunk transit upgrades supporting the Brisbane Metro rollout and ongoing works under the Victoria Park / Barrambin Master Plan ahead of the Brisbane 2032 Olympic and Paralympic Games.
Amenities near 32-34 Lower Clifton Terrace, Red Hill
Built-in buyer protection
State-backed peace of mind for your new home.
6.5-year structural protection
Covered for up to 6 years and 6 months post-completion.
1-year builder care period
Maintenance and aftercare coverage for up to 1 year post-completion.
Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.
Priority access to new developments near Red Hill
By continuing you agree to updates and to our Terms & Privacy Policy


