1/8
22 Grant Street, Noosa Heads

22 Grant Street, Noosa Heads

22 Grant Street, Noosa Heads QLD 4567

Construction completeSold out
  • 2 residences
  • Apartments
  • Pool
Progress verified
Year completed 2025
  1. Plans approved
  2. Construction started
  3. Construction complete
  4. Completed 2025

Construction is complete and ready to move in

Dual luxury townhouses arrayed over three levels, offering the best in luxury coastal living.

Molti collaborates with Blackwood Architecture to create these two beautifully curated dual townhouses.

Arrayed over three levels, with private lifts, pools and stunning views of the Noosa Hinterland, they offer the best in contemporary living.

New Apartments for sale in 22 Grant Street, Noosa Heads

Access the latest brochure, pricing and floorplan details for 22 Grant Street, Noosa Heads.
3 bedroom apartments from $3,600,000
3 bed
2 bath
Our take by

Apartments loves 22 Grant Street, Noosa Heads because…

Palmera represents an expertly calibrated built form by developer Molti, brought to life through a collaborative design by Blackwood Architecture and Martino Group. Anchored by a structural concrete podium that delivers substantial thermal mass, the stepped architectural massing negotiates the sloping topography to unlock fluid indoor-outdoor transitions. Inside, vertical voids operate as thermal chimneys alongside expansive louvred glazing and stacking sliders, optimising natural cross-ventilation, solar shading, and climatic performance.

Amenities

  • Pool Pool

Development information for 22 Grant Street, Noosa Heads

Local Government Area:
Noosa Shire
Project Status:
Construction complete
Year Completed:
2025
Residences:
2
Building Type:
Townhouses

Meet the team behind 22 Grant Street, Noosa Heads

Amenities near 22 Grant Street, Noosa Heads

Built-in buyer protection

State-backed peace of mind for your new home.

6.5-year structural protection

Covered for up to 6 years and 6 months post-completion.

1-year builder care period

Maintenance and aftercare coverage for up to 1 year post-completion.

Standard statutory warranty periods vary by state. Terms apply under local residential building guidelines.

Queensland Government